This platform is currently in BETA.

This platform and the Triggers available are still in BETA. This means they may be subject to change. If that happens, please update usage of the Triggers in your Project accordingly.

Documentation of the library and the available Triggers is ongoing, and may be incomplete.

Instructions for: GroeneBatenPlanner

Back to GroeneBatenPlanner documentation

Follow these steps to add this Trigger to your Project.

General instructions

  1. Add a new Trigger to your Project
  2. Set the "name" of the Trigger to "GroeneBatenPlanner"
  3. Set the "type" of the Trigger to: TQL
  4. Set the "timing" of the Trigger to: BEFORE
  5. Set the "method" of the Trigger to: GET
  6. Set the "timeout" of the Trigger to at least: 140
  7. Set the "URL" of the Trigger to: https://triggers.utils.tests.tygron.com/task/?trigger=GroeneBatenPlanner
  8. Add the following assets to your Project, as desired:
    groenebatenplanner-indicator-v3.xlsx
    An Excel file which should be added to the Project as Indicator.

Trigger-specific instructions

Trigger usage instructions

Add an Area to your project, with "ACTIVE" set to "1" and "GBP_MEASURE" set to a valid ID of a Groene Baten Planner measure. Recalculate the project, and the Indicator will display the changes between the original situation and the situation with the indicated measures applied

For any given session, the first time the calculation is run the calculation time will be longer ( approx. 90 seconds ), as the tool needs to establish a baseline. Subsequent calculations will take about half as long ( approx. 45 seconds ).

Under very rare circumstances, the authentication key used to communicate with the service may become invalid. In these situations, completely closing and restarting the session will allow the connection to reauthenticate.

The following ID's are valid to use:

IDMeasure name
3Straatbomen en bomenlanen
4Urban wetlands
16Groene daken
6Wadi's met drainage
14Groene gevels
19Berging door de realisatie van extra wateroppervlak
22Infiltratievelden en infiltratiestroken met bovengrondse opslag
25Stadsbossen
26Waterdoorlatende verharding
41Waterpleinen
42Groene daken met afvoervertraging
71Bergingsvijver
81Dijken
83Kade lage dijkjes
84Droogtebestendige planten en bomen
86Gras aanleggen
89Tijdelijke kering
91Ontharden : Verharding eruit, groen erin