This platform is currently in BETA.
This platform and the Triggers available are still in BETA. This means they may be subject to change. If that happens, please update usage of the Triggers in your Project accordingly.
Documentation of the library and the available Triggers is ongoing, and may be incomplete.
Follow these steps to add this Trigger to your Project.
Add an Area to your project, with "ACTIVE" set to "1" and "GBP_MEASURE" set to a valid ID of a Groene Baten Planner measure. Recalculate the project, and the Indicator will display the changes between the original situation and the situation with the indicated measures applied
For any given session, the first time the calculation is run the calculation time will be longer ( approx. 90 seconds ), as the tool needs to establish a baseline. Subsequent calculations will take about half as long ( approx. 45 seconds ).
Under very rare circumstances, the authentication key used to communicate with the service may become invalid. In these situations, completely closing and restarting the session will allow the connection to reauthenticate.
The following ID's are valid to use:
| ID | Measure name |
|---|---|
| 3 | Straatbomen en bomenlanen |
| 4 | Urban wetlands |
| 16 | Groene daken |
| 6 | Wadi's met drainage |
| 14 | Groene gevels |
| 19 | Berging door de realisatie van extra wateroppervlak |
| 22 | Infiltratievelden en infiltratiestroken met bovengrondse opslag |
| 25 | Stadsbossen |
| 26 | Waterdoorlatende verharding |
| 41 | Waterpleinen |
| 42 | Groene daken met afvoervertraging |
| 71 | Bergingsvijver |
| 81 | Dijken |
| 83 | Kade lage dijkjes |
| 84 | Droogtebestendige planten en bomen |
| 86 | Gras aanleggen |
| 89 | Tijdelijke kering |
| 91 | Ontharden : Verharding eruit, groen erin |